Over the years and thanks to its professionality and seriousness, Damiana has expanded its customer portfolio.
Below is a short list of the main works performed.

PREFABRICATION OF PIPE SUPPORTS AND SMALL/MEDIUM SIZE STEEL STRUCTURES
1

CLIENT

PROJECT

QUANTITY

YEAR

ENEL

MARITZA

190 tons

2010-11

DANIELI

MARCEGAGLI

110 tons

2010-11-1

ALSTOM

TPP

125 tons

2012-13

WTE

CREMONA

35 tons

2012-13

ABL

Dalmine

280 tons

2013-14

AKZ

Burgas H-oil Burgas

232 tons

2014

SICES

H-OIL

160 tons

2014

Alstom Power Italia

Alstom Power Ita

12 tons

2015

A.B.L. S.r.l.

Italcementi Group

16 tons

2015

TECHNIP

H-OIL

45 tons

2015

Sices

Montaz Lotos

125 tons

2015-16

SICES

Exxon

250 tons

2015-16

SICES

Syngenta

15 tons

2016

Technoexport storage

Marcon montage

27 tons

2016

Sices

Tempa rossa

478 tons

2016-17

Ponticelli / Valtube

Biogen

356 tons

2016-17

Sices

Duslo

241 tons

2016-17

Valtube

Witenberg

9,0 tons

2017

Technip

Jebel Ali UAE

580 tons

2017-2018

Fincimec

OMV Petrom Romania

130 tons

2018

Fincimec

Air liquide Fos sur Mer FR

20 tons

2018

Total:

3.436 tons

INSTALLATION OF STEAM TRACING AS CARBON STEEL PIPES OF TUBING TYPES
1

CLIENT

PROJECT

QUANTITY

YEAR

A.B.L. S.r.

Calusco D` Adda

2.000 mt.

2014-15

Sices/Technip

H-oil Burgas

47.337 mt.

2014-15-16

Ponticelli

EPC2-EXXON ANTWERP

23.000 mt.

2017

IREM

EPC2-EXXON ANTWERP

4.800 mt.

2017-2018

KT Kinetics

Efra Lotos Poland

65.000 mt.

2017-2018

Bilfinger Belgium

EPC1-EXXON ANTWERP

16.000 mt.

2018

Clemessy

Total La Mede

3.500 mt.

2018-19

Bilfinger LTM France

Total La Mede

2.000 mt.

2018-19

Total:

181.800 mt.

PREFABRICATION OF PIPE SUPPORTS AND SMALL/MEDIUM SIZE STEEL STRUCTURES
1

CLIENT

PROJECT

QUANTITY

YEAR

A.B.L. S.r.l.

Calusco D` Adda-tank

165,0 tons

2014

Alstom Power Italia

Riva Acciai Siviglia

292,0 tons

2014

A.B.L. S.r.l.

Ekoplant – Tenaris Dalmine

106,0 tons

2014/15

A.B.L. S.r.l.

Calusco D` Adda

18,0 tons

2015

Dyrhoff Ltd

Le Bosche

11,3 tons

2015

Dyrhoff Ltd

Cimena

11,8 tons

2016

Sices

LUKOIL

38,7 tons

2016

Team Network

Mestre Italy

600 tons

2017

Team Network

Dunkerque France

600 tons

2017/2018

TPP Sofia

Heating Boiler – tube panels replacement

32 tons

2018

Total:

1874.8 tons

MAINTENANCE OF OIL REFINERY AND POWER PLANTS, AND OTHERS
1

CLIENT

PROJECT

QUANTITY

YEAR

A.B.L. S.r.

Calusco D` Adda

3700,0 mhs

2014

Danieli & Officcine Meccaniche

NLMK Verona

2720,0 mhs

2014

NLMK Verona

Verona

3940,0 mhs

2014

A.B.L. S.r.l.

San Zeno Naviglio

1.500,0 mhs

2015

Speranza Michele S.r.l

Centrale Termoelectrica di Tavazzano

650,0 mhs

2015

Sices

H-oil Burgas

52.600,0 mhs

2015/16

Technip

H-oil Burgas

1.750,0 mhs

2015/16

Italcementi Grup

Devnya Cement

8.000,0 mhs

2015/16

Ponticelli

EPC2-EXXON ANTWERP

23.000,0 mhs

2017

GSI Balkan

LUKOIL

3.900,0 mhs

2017

Technip Italy

Duslo SK 4

5.000 mhs

2018

Total:

146.760,0 mhs